SteplaneStart the free check

Steplane › Guides › Freight claim letter templates

Freight claim letter templates: notice of damage and formal claim

Updated 19 October 2026 · Written by Paul, founder of Steplane, a logistics process specialist with over 13 years in logistics, including at some of the biggest freight forwarders in the world.

In short: A freight claim letter tells the carrier in writing which shipment is affected, what was lost, damaged or delayed, that you hold it liable and, in the formal claim, the amount you want paid. Under CMR, send written notice within 7 days for hidden damage (Sundays and public holidays excluded) and within 21 days for delay. In the US, file the written claim with an amount within the bill of lading time limit, at least 9 months.

First the notice keeps your rights, then the formal claim asks for the money with the documents. The free letters below cover both steps, in an EU version under CMR and a US version under Carmack and 49 CFR 370.

Go to the free download

Key facts

Notice of damage (CMR art. 30)

Under CMR, what you do on the day of delivery decides most claims. If the consignee signs a clean CMR and says nothing, that is prima facie evidence the goods arrived as described.

SituationWhat to doTime limitCMR
Damage or shortage visible at deliveryWrite a clear remark on the CMR before signing, giving a general idea of the damageAt deliveryArt. 30(1)
Damage not visible at deliverySend written notice to the carrier (letter A)7 days from delivery, Sundays and public holidays excludedArt. 30(1)
Joint check with the carrierOnly non-apparent damage can still be raised, in writing7 days from the check, Sundays and public holidays excludedArt. 30(2)
DelaySend a written reservation (letter B)21 days from the goods being placed at the consignee’s disposalArt. 30(3)
Goods not deliveredTreat as lost and claim30 days after the agreed time, or 60 days after taking over if no time was agreedArt. 20(1)

The day of delivery, of the check or of placing the goods at disposal is not counted (art. 30(4)).

Formal claim letter

The notice keeps your rights. The formal claim asks for money. Send it as soon as you know the amount, with the documents.

Under art. 32(2), a written claim suspends the 1-year limitation period until the carrier rejects it in writing. Keep proof of the date you sent it.

US Carmack claim (49 CFR 370)

For interstate truck freight in the US, the motor carrier is liable under the Carmack Amendment (49 U.S.C. 14706). The claim rules are in 49 CFR Part 370.

RuleWhat it saysSource
Filing timeA carrier may not set less than 9 months to file a claim. Check the bill of lading for the actual limit.49 U.S.C. 14706(e)
Lawsuit timeNot less than 2 years, counted from the carrier’s written notice that it disallowed the claim.49 U.S.C. 14706(e)
What counts as a claimA written claim that identifies the shipment, asserts liability and asks for a specified or determinable amount of money.49 CFR 370.3(b)
AcknowledgmentThe carrier acknowledges in writing within 30 days, unless it pays or declines in that time.49 CFR 370.5(a)
DecisionThe carrier pays, declines or makes a firm compromise offer in writing within 120 days, then reports status every 60 days while open.49 CFR 370.9(a)

A claim without an amount may not count as a claim at all. If you do not know the final figure yet, state your best estimate and say it may be updated.

Letter to your customer

If you are the forwarder or broker, your customer is waiting too. A short, early letter keeps the relationship calm and stops them from guessing.

Subject: Your shipment [ref]: damage claim opened

Dear [name], we have received your report of [damage / shortage] on shipment [ref], delivered on [date]. We have sent written notice to the carrier on [date] and asked for an inspection. To file the formal claim, please send us the commercial invoice, photos and the repair or replacement cost by [date]. We will update you by [date]. Please keep the goods and the packaging until the inspection.

Do not promise to pay the claim yourself before you know the carrier’s position and your own terms.

What to attach

DocumentEU (CMR)US (Carmack)
Transport documentCMR consignment note with remarksBill of lading
Delivery proofSigned CMR or delivery noteDelivery receipt / POD with exceptions
Value of the goodsCommercial invoiceCommercial invoice
PhotosDamage, packaging, vehicle, sealDamage, packaging, trailer, seal
Cost of the damageSurvey report, repair or replacement quoteInspection report, repair estimate, salvage record
Freight chargesFreight invoice (claimable under art. 23(4))Freight bill
WeightPacking list (for the per kg limit)BOL weight
Your noticeLetter A or B with proof of sendingLetter A with proof of sending

Download the free claim letters

Download EU letters, CMR (.docx) Download US letters, Carmack (.docx)

Free, no sign-up. Word format (.docx), fully editable.

Get the claims and damage kit

Seven steps from damage found to a closed claim file: a damage report form for drivers and warehouse staff, claim letters to the carrier, letters to the customer and an Excel claims log that calculates the CMR or US deadlines. EU and US versions.

Get the claims and damage kit

€49 (about $55) per kit, one-time. EU and US versions. Any 3 kits €99, all 6 kits €199. 14-day money-back guarantee.

Related guides

Sources

Questions

How long do I have to file a freight claim under CMR?

Visible damage must be noted at delivery. Hidden damage needs written notice within 7 days of delivery, Sundays and public holidays excluded, and delay within 21 days. Court action must start within 1 year, 3 years for wilful misconduct.

How long do I have to file a freight claim in the US?

The bill of lading sets the limit, but a motor carrier may not set less than 9 months for filing a claim or less than 2 years to sue (49 U.S.C. 14706(e)).

How long does a carrier have to answer a freight claim in the US?

Under 49 CFR 370.5 and 370.9 the carrier acknowledges in writing within 30 days and pays, declines or makes a firm offer within 120 days, then updates you every 60 days while it stays open.

What is the difference between a notice of damage and a claim?

The notice tells the carrier there is damage and protects your rights. The claim asks for a specific amount of money with the documents to prove it.

How much can I claim under CMR?

The value of the goods at the place and time of taking over, plus carriage charges and duties, limited to 8.33 SDR per kg of gross weight lost or damaged, unless a higher value or special interest was declared on the CMR.

Who should the claim go to?

To the carrier you contracted with or that issued the CMR or bill of lading. If you are a forwarder, your customer usually claims from you and you claim from the carrier, so keep both files linked.

Does “subject to inspection” on the delivery receipt protect me?

Often not enough. Write what you actually see, for example the number of cartons crushed or short, and take photos before the driver leaves.

See your own quote-to-invoice process in about 10 minutes

Answer simple questions about how your company works today. You get the process map with owners, triggers and records, the money leaks with estimates and a written procedure. Free, no sign-up.

Start the free check